Projects

Leeds Beckett University – Caedmon Hall

By |12 November 2024|

Project Location: Leeds, West Yorkshire BMS System Fitted: Client: About this Project: Linear Control Systems Ltd. (LCSL) is honoured to have partnered with Tilbury Douglas in the refurbishment of the historic, Grade II listed Caedmon Hall for Leeds Beckett University. This newly renovated building now provides a state-of-the-art facility for the Carnegie School of Education, offering a modern and efficient environment while preserving the architectural heritage of this iconic space. Following our earlier work on the university’s Carnegie School of Sport in 2020,

Bradford College – Garden Mills

By |12 November 2024|

Project Location: Bradford, West Yorkshire BMS System Fitted: Client: About this Project: Working alongside G&H Group, the project involved the transformation of the former 1900’s derelict mill into a new learning environment for Bradford College. The 5-storey, 2,915m² building is now the dedicated home for HNC, HND and degree programmes in STEM (Science, Technology, Engineering & Mathematics) and opened to students in Autumn 2024. A Trend Building Management System was installed to seamlessly integrate with the existing College’s site wide system and infrastructure.

The KIA Oval – One Oval Square Stand, London

By |24 July 2023|

Project Location: Kennington Oval, London BMS System Fitted: Client: About this Project: The Oval is the home of Surrey County Cricket Club and the project comprised an increase in general admission seating of 4000 in 2 new upper tier seating decks and hospitality space for 1400 in new lounges, a fantastic roof terrace with fabulous views across London, new retail space, ticket office and security rooms and an extension and refit to the historic pavilion. The Oval is arguably the second biggest, most

The Wave, Coventry

By |24 July 2023|

Project Location: Coventry BMS System Fitted: Client: About this Project: Linear Control Systems involvement in the development of The Wave included the design, supply and installation of the mechanical, electrical and specialist service packages at flagship scheme in the centre of Coventry. The £36.7m project was a fully bespoke scheme comprising the latest rides and facilities, and included a water park with slides, a 25-metre swimming pool, gym, squash courts, dance studio, and day spa. Work on the design of the scheme started

York St John’s University – Creative Centre

By |23 July 2023|

Project Location: York BMS System Fitted: Client: About this Project: The new York St John Creative Centre is a purpose-built, 3-storey creative space where bold architecture meets innovative facilities. The Creative Centre opened in 2022 and is the new permanent home for our music and computer science courses. It also contains specialist spaces for our theatre, drama, creative writing, and media production students. First opened to students in October 2021, the York St John Creative Centre provides a permanent new home for those

Globe Point No.1, Leeds

By |23 July 2023|

Project Location: Leeds BMS System Fitted: Client: About this Project: Located at the entrance to the Temple District in Leeds, with its angular facade overlooking Holbeck, Globe Point is where Temple Begins. The building’s 37,800 sq ft of Grade A space is laid out over seven floors across dual aspect floorplates. Fantastic for natural lighting. The feature roof terrace is a common space ideal for entertaining or meeting, offering spectacular views. Learn more about this 40,000+ sq. ft. self-contained workspace with feature roof

Carnegie School of Sports, Leeds

By |23 July 2023|

Project Location: Leeds, West Yorkshire BMS System Fitted: Client: About this Project: CSS is the first building as part of the Leeds Beckett University Campus that LCSL have carried out. Utilising a Tridium Niagara 4 Building Management System, LCSL carried out full control & integration of the gas safety systems, LTHW heating, DHWS, Modbus VAV’s & Modbus Space temperature C02 sensors, Air Handling Units, Chilled Water Systems, VRF systems, Lighting / PIR integration systems and full metering. LBU are proud to call themselves

Vulcan House, Sheffield

By |23 July 2023|

Project Location: Sheffield, South Yorkshire BMS System Fitted: Multiple Client: Client: About this Project: Phased upgrade of both buildings J1 & J2 (Iron & Steel), LCSL are carrying out a full upgrade of control panel outstations and FCU controls. This is on a floor by floor basis whilst keeping the existing site live and operational to staff. Migrating each floor to a new front end PC, whilst keeping existing site wide comms live to the old PC to

One City Square, Leeds

By |23 July 2023|

Project Location: Leeds BMS System Fitted: Client: Client: About this Project: Linear Control Systems Ltd, in conjunction with Ardmac & Key have completed a large upgrade of the legacy site wide building management system (BMS) at the landmark 1 City Square building, Leeds. The overall purpose of carrying this out was to provide the end client with a fully functional smart building controls system, which could provide optimal comfort for tenants, whilst providing energy savings throughout. Ardmac began this

Fulham FC – Riverside Stand

By |23 July 2023|

Project Location: London BMS System Fitted: Client: About this Project: LCSL have supplied a full building and energy management system complete with the integration of 3rd party LG packaged air handling units, LG VRF, cold water services, electric, water, gas & energy metering, S&S northern gas safety systems, packaged PHE’s, Gas booster systems, Sprinkler System, Irrigation systems, pitch lighting, UPS monitoring, Smoke Damper system, Lighting / Emergency Lighting, Heat interface units, LV Switch gear monitoring, CAV’s, C02 monitoring, LTHW systems, Lifts & Spa

Whitby Hospital

By |20 July 2023|

Project Location: Whitby, North Yorkshire BMS System Fitted: Client: About this Project: The new building has been fitted with a Siemens Building Management System. Using both Siemens for the hardware and a Niagara front end supervisor graphic package. Linear have designed, installed, commissioned & now maintain the Building Management System (BMS) at Whitby Hospital. Linear has encompassed all aspects of the building controls, bringing together, and providing full control of the air handling units, VRF, heat recovery units, extract fans, supply fans, zone

Wellington Place Estate

By |20 July 2023|

Project Location: Wellington Street, Leeds Client: Client: About this Project: Wellington Place, Leeds, is constantly expanding with new buildings been built year on year. So far Linear Control Systems Ltd (LCSL) have designed, installed, and commissioned & currently maintain 5 buildings on the estate and are currently installing the next 2. Completed 6 Wellington Place 5 Wellington Place 3 Wellington Place 7 & 8 Wellington Place Under Construction 11 & 12 Wellington Place

MMU Science & Engineering Building

By |20 July 2023|

Project Location: Manchester BMS System Fitted: Client: About this Project: Linear Control Systems Ltd are proud to be continuing a great relationship with both NG Bailey & Manchester Metropolitan University (MMU) carrying out yet another large project on the estate. This follows on from such projects as Birley Fields & Business School. Utilising a Cylon ABB system, LCSL are integrating the new building onto the new ASPECT head end linking all buildings on the campus together. Manchester Metropolitan University is committed to creating

Middlesbrough Sports Village

By |24 November 2021|

Project Location: Middlesborough BMS System Fitted: Client: About this Project: Middlesbrough Sports Village involved the creation of a £10m multi-sports hub building set within a wider sports campus. The project involved the consolidation of several existing leisure sites in Teesside creating a purpose-built facility for a wide range of users. The facilities included an indoor sprint track and events arena, gym, outdoor athletics track, 700-seater grandstand, velodrome and multi-use games pitches. Working for our longstanding client NG Bailey, the project was delivered on

Wedge House – South Bank London

By |24 November 2021|

Project Location: South Bank, London BMS System Fitted: Client: About this Project: The Hoxton, Southwark, is an ambitious new refurbishment of a former social security office located on London’s south bank. The Hoxton Hotel incorporates 192 hotel rooms, restaurants, bars and function rooms, as well as 4,000 m2 of flexible co-working office space, all within a sleek and contemporary building. The first two storeys of the new building contain public areas for the hotel. Six floors of hotel rooms provide 192 rooms and

7 & 8 Wellington Place, Leeds

By |24 November 2021|

Project Location: Leeds BMS System Fitted: Client: About this Project: Making history as the biggest ever office pre-let in Leeds, 7 & 8 Wellington Place is the new home for the Yorkshire Government Hub, providing grade A office space. The 378,000 sq. ft. building will be fully let on a 25-year lease, signed by HM Revenue and Customs, and is expected to bring over 6,000 civil servants to the centre of Leeds. The Leeds hub will transform central Government’s estate by accommodating multi-departmental

MMU 6 Great Marlborough Street

By |18 November 2020|

Project Location: 6 Great Marlborough Street, Manchester BMS System Fitted: Client: About this Project: 6 GMS, on behalf of Manchester Metropolitan University (MMU), opened its new facility in late 2018 and facility provides a smart, attractive environment specifically designed to house a number of professional services teams from across Manchester Metropolitan to encourage collaborative, partnership working to support the wider student experience. The former Victorian warehouse, located within the historic Little Ireland area of central Manchester, forms the initial pilot scheme and catalyst

Reading FC Bearwood Park Training Ground

By |18 November 2020|

Project Location: Reading FC Training Complex BMS System Fitted: Client: About this Project: The site at Bearwood Estate was identified and contracts were initially exchanged with the Royal Merchant Navy School Foundation for the purchase of nearly 120 acres of land in October 2013. The planning process was difficult and protracted and progress stalled at times but, in little more than two years at the helm, Mr Dai’s determination and vision has entirely transformed the promise of a modern purpose-built training

AFC Wimbledon Plough Lane Stadium

By |13 October 2020|

Project Location: Wimbledon Plough Lane BMS System Fitted: Client: About this Project: It has been 29 years since Wimbledon last kicked a ball in anger at Plough Lane when they took on Crystal Palace in the top-flight. Since then it has been a long road back. There was the controversial move to Milton Keynes and the rebranding to MK Dons, the formation of the fans-owned AFC Wimbledon 18 years ago and six promotions. But now they have built a new stadium a few hundred yards from

Vita Student Accomodation, York

By |19 April 2018|

Project Location: Lawrence Street, York BMS System Fitted: Client: About this Project: The 11th development from the award-winning student accommodation brand. The first purpose-built private campus in the UK. A landmark moment in the UK’s £200 billion student property market. Vita Student Village York brings 18 modern student residences to an extensively landscaped, 25,000 sq. m listed site in historic York. Linear Control Systems have recently completed the complete installation and integration of over 18 separate blocks and 2 energy centres.

Ashton Gate Stadium, Bristol

By |1 November 2017|

Project Location: Bristol BMS System Fitted: Client: About this Project: After undertaking the successful installation of the south stand Building Energy Management System during the summer of 2015, Linear Control Systems have installed and are currently finalising the commissioning for the third phase of the Building Energy Management System for the west stand at Ashton Gate Stadium, Bristol. Both building management systems are based on the Niagara AX frame work. The BEMS will control the varied range of the plant to provide the

Manchester Metropolitan University – Birley Fields Campus

By |5 December 2014|

Project Location: Birley Fields, MMU, Manchester BMS System Fitted: Client: Linear Control Systems installs BMS at Manchester University’s Birley Fields: Linear Control Systems have recently completed the installation of the building management system at a project which is part of the Manchester Metropolitan University Birley Fields Campus. Birley Fields is the final stage of a £350m investment in new campus facilities for Manchester Metropolitan University. It is the largest construction project in Manchester Metropolitan University’s 10-year plan to consolidate their estate; from seven

Manchester Metropolitan University (MMU), Manchester

By |4 December 2014|

Project Location: Manchester BMS System Fitted: Client: About this Project: The new Manchester Metropolitan University Business School and Student Hub is an innovative building that opened in 2012; as part of a huge overhaul that saw seven campuses consolidated into two. The new 20,000sq metre state of the art building incorporates three individual towers and two atrium areas connecting the three towers. It boasts not only world-class teaching and learning facilities for 5000 students and 250 staff, but also catering and leisure areas

Daventry College (UTC), Northamptonshire

By |2 December 2014|

Project Location: Daventry, Northamptonshire BMS System Fitted: About this Project: Daventry UTC is a unique institution; in terms of both the education concept & the facilities on offer. Students aged 14-19 have the chance to follow a high quality, technically-orientated studies, in sustainable facilities equipped to the highest standards. The UTC’s focus on sustainable and related new technologies in engineering, sustainable construction, and environmental sustainability reflects the growing demand by businesses in the UK for well-qualified technical specialists.

Dixons Allerton Academy, Bradford

By |1 December 2014|

Project Location: Bradford, West Yorkshire BMS System Fitted: Client: About this Project: Dixons City Academy is located in Bradford and has been awarded the title Centre of Educational Excellence. Originally founded in 1990, the academy focuses mainly on performing arts – allowing it to select 10% of students based purely on talent within the local area. The academy does repeatedly well in Ofsted reports and carries a recognised specialism in health and science. Dixons Allerton Academy’s new £29m facility on Rhodesway in Allerton

Trinity Academy, Halifax

By |18 November 2014|

Project Location: Halifax, West Yorkshire BMS System Fitted: Client: About this Project: Trinity Academy was designed as a carbon neutral, modern energy efficient School. Trinity Academy Halifax, Yorkshire, sticks by a very distinct Christian ethos and promotes innovative approaches to curriculum and rewarding students. Their vision is to inspire students through high-quality teaching methods led by solid Christian values. Originally founded in 1815 and known previously as Holy Trinity Church of England Senior School, Trinity Academy Halifax has undergone an ambitious redevelopment project

iceSheffield, South Yorkshire

By |17 November 2014|

Project Location: Sheffield BMS System Fitted: Client: About this Project: Located in Lower Don Valley, iceSheffield is a fabulous ice arena consisting of two Olympic-size ice rinks and 1,500 seats for the public. Construction was completed in May 2003 to the cost of £15million and the arena is now home to the majority of hockey teams in the Sheffield area. Aside from hockey games, the venue also plays host to a number of different events including disco nights for the youth of Yorkshire.

Swillington Primary School, Leeds

By |16 November 2014|

Project Location: Leeds, West Yorkshire BMS System Fitted: Client: About this Project: Swillington Primary School, alongside Brigshaw High School, plus 6 other feeder Primary Schools are collectively known as The Brigshaw Co-operative Trust. This trust allows the school to establish partnerships with Leeds City College, the Co-operative Trust, Carnegie leaders in learning, Cape UK and Leeds City Council. Working underneath the trust, all the schools work alongside each other to achieve a shared vision for raising accomplishments. Swillington Primary School in Leeds was

Molineux Stadium, Wolverhampton FC

By |15 November 2014|

Project Location: Wolverhampton BMS System Fitted: Client: About this Project: Molineux Stadium has been the home of Wolverhampton Football Club since 1889. The stadium is renowned for being the first ‘new build’ stadium of its kind in the history of the football league. This magnificent stadium was one of the first to install floodlights and was responsible for hosting some of the first ever European club games back in the 50s. By the time the 90s arrived, Molineux became one of the biggest

Hepworth Art Gallery, Wakefield

By |13 November 2014|

Project Location: Wakefield, West Yorkshire BMS System Fitted: Client: About this Project: The Hepworth Art Gallery has been labelled, by The Independent, as one of the most supreme contemporary art museums in the whole of Europe. Spanning across 1,600 square meters of gallery space, The Hepworth Art Gallery is officially the largest purpose-built exhibition arena outside of the capital city. Bringing together rare pieces from Barbara Hepworth and other contemporary artists from the Wakefield area, this building offers a wealth of culture and

Holbeach University Academy, Lincolnshire

By |12 November 2014|

Project Location: Spalding, Lincolnshire BMS System Fitted: Client: About this Project: Holbeach University Academy aims to bring out the full potential in all of their students, providing the best possible educational options and experiences along the way. The academy provides broad, general education in order to nurture well balanced and adjusted students who are in turn able to work hard and respect one another. Based in Spalding, Lincolnshire – this prestigious academy has valuable partnerships with the University of Lincoln as well as

The Copthorne Hotel (Sheffield United Football Club)

By |9 November 2014|

Project Location: Sheffield BMS System Fitted: Client: About this Project: The Sheffield United Copthorne Hotel is located directly beside the Sheffield United FC stadium. Containing no less than 158 guest rooms, this stylish and modern hotel also boasts a luxurious penthouse suite. The hotel has a range of facilities, including a fitness room, conference room, on-site parking and banqueting suites.  Not to mention the renowned 18fifty5 Restaurant, awarded a Rosette to celebrate its fine dining and excellent cuisine.

Harewood House, Leeds

By |8 November 2014|

Project Location: Leeds Client: Harewood Estate Looks to Sustainable Future with Biomass Energy Harewood House is officially known as one of the Treasure Houses of England, sitting comfortably at the heart of Yorkshire. Built in the 18th century, the building houses fine art collections equalling the finest throughout the UK and is set against the backdrop of the stunning Yorkshire landscape. The area consists of contemporary art exhibitions, award-winning educational departments, a bird garden and 100 acres of rolling greenery for visitors to discover. Linear Control Systems

City Point, Leeds

By |8 November 2014|

Project Location: Leeds BMS System Fitted: Client: About this Project: City Point is a giant modern office block located in the centre of Leeds, measuring just over 5,500 square meters in total. The building has been finished to the highest of standards and offers local businesses high-profile office space opportunities.  Located on the corner of Park Place and King Street in the middle of the financial district of Leeds, the building has attracted much attention from a number of high-profile tenants. With seven

Ridham Docks, Kent

By |7 November 2014|

Project Location: Sittingbourne, Kent About this Project: Ridham Docks was initially established during the First World War as an avenue to distribute ammunition. Located on the banks of the River Swale in Kent, the docks have also historically been used to import raw materials for the creation of newsprint at Kemsley Mill. The port is now connected with the UK rail network and houses over 11,000 square meters of warehousing space. The docks can accommodate vessels up to 5000 DWT and a large variety of cargoes can be handled here. The

Go to Top