Carnegie School of Sports, Leeds

Project Location:

Leeds, West Yorkshire

BMS System Fitted:

Client:

About this Project:

CSS is the first building as part of the Leeds Beckett University Campus that LCSL have carried out. Utilising a Tridium Niagara 4 Building Management System, LCSL carried out full control & integration of the gas safety systems, LTHW heating, DHWS, Modbus VAV’s & Modbus Space temperature C02 sensors, Air Handling Units, Chilled Water Systems, VRF systems, Lighting / PIR integration systems and full metering.

LBU are proud to call themselves a leading centre of sports education. Located in the centre of Leeds, unveiled the new £45million state-of-the-art training and research centre.

Leeds Beckett University has an outstanding pedigree in sports education stretching back to 1933 and the prestigious Carnegie College of Physical Training. Today, students, staff and alumni of the Carnegie School of Sport are leaders in national and international sport.

More about this project

To ensure this success continues, the university has invested £45m in a building that provides not only a state-of-the-art learning space, but a hub for elite athletes and industry partners.

The 90,000 sq ft new home for the Carnegie School of Sport is a significant addition to the historic Headingley Campus. The building co-locates specialist teaching and research laboratories alongside a range of exceptional amenities including a high-performance strength and conditioning facility, human movement research laboratory and a performance analysis lab. A high-level sprint track – complete with force plates and motion-camera recording – projects over the main athletics area outside to create a unique link between the academic research taking place within the building and the wider campus.

Click here to learn more about the facilities at Carnegie School of Sport

Share this Project!