Vulcan House, Sheffield
About this Project:
Phased upgrade of both buildings J1 & J2 (Iron & Steel), LCSL are carrying out a full upgrade of control panel outstations and FCU controls. This is on a floor by floor basis whilst keeping the existing site live and operational to staff. Migrating each floor to a new front end PC, whilst keeping existing site wide comms live to the old PC to ensure full control for building occupants. This includes night and working works to ensure full capacity.
Vulcan House in Sheffiled is currently being upgraded; utilising Niagara 4 supervisor software, Siemens fan coil unit controls & Frese hook up sets & PICV’s all supplied by LCSL.