Globe Point No.1, Leeds
About this Project:
Located at the entrance to the Temple District in Leeds, with its angular facade overlooking Holbeck, Globe Point is where Temple Begins.
The building’s 37,800 sq ft of Grade A space is laid out over seven floors across dual aspect floorplates. Fantastic for natural lighting. The feature roof terrace is a common space ideal for entertaining or meeting, offering spectacular views.
Learn more about this 40,000+ sq. ft. self-contained workspace with feature roof terraces here.
LCSL are continuing a longstanding relationship with CEG following on from the completion of Kirkstall Forge, Linear are now working alongside BAM to begin the flagship development of the Leeds Temple area of the Southbank.
Smart & Sustainable Technology
For CEG, sustainability goes beyond compliance. Sustainability is woven into every area of our business. It’s embedded in the way we design, construct and manage our buildings, and the goals we set ourselves.
Driven by energy optimisation and BREEAM, Linear Control Systems are integrating packaged air handling units, VRF systems, lift systems, lighting systems, water, heat & electric metering, leak detection, blind control system, access controls, security controls, fire system, VAV systems, VOC, C02, electric heating, Cold Water Systems and DHWS.