The Wave, Coventry

Project Location:

Coventry

BMS System Fitted:

Client:

About this Project:

Linear Control Systems involvement in the development of The Wave included the design, supply and installation of the mechanical, electrical and specialist service packages at flagship scheme in the centre of Coventry.

The £36.7m project was a fully bespoke scheme comprising the latest rides and facilities, and included a water park with slides, a 25-metre swimming pool, gym, squash courts, dance studio, and day spa.

Work on the design of the scheme started on site December 2017 and was completed September 2019.

Learn more about The Wave, Coventry.