Wilson Field Leisure Centre, Lancashire

Project Location:

Clayton-le-Moors, Lancashire

BMS System Fitted:

Client:

About this Project:

Continuing our established relationship with TClarke, we were proud to contribute to the successful delivery of a state-of-the-art leisure facility at the Wilson Sports Village in Clayton-le-Moors. This modern centre includes:

  • A 4-lane, 25-metre swimming pool
  • Fully equipped gym
  • Multi-use studio
  • Sauna & steam room
  • On-site café
LCSL played a key role in delivering the Wilson Field Leisure Centre project by installing a state-of-the-art Tridium BMS, enhancing energy efficiency and performance across all building systems in this flagship community leisure facility.

More about the Wilson Field Leisure Centre project

LCSL was responsible for the installation of a Tridium Building Management System (BMS), designed to control, monitor, and integrate the site’s HVAC systems. This includes:

  • LTHW Air Source Heat Pumps
  • Ventilation systems
  • Hot and cold domestic water systems
  • VRF (Variable Refrigerant Flow) systems

The system is fully visualised and controlled through a dedicated Niagara graphics package, ensuring intuitive operation and efficient performance monitoring.

The project was completed to a high standard and on schedule.

The centre officially opened to the public in October 2025, providing the community with a high-quality, energy-efficient leisure facility.

For more information on this project please visit https://www.hyndburnbc.gov.uk/wilson-sport-village/.

Share this Project!