Sport

The KIA Oval – One Oval Square Stand, London

By |24 July 2023|

Project Location: Kennington Oval, London BMS System Fitted: Client: About this Project: The Oval is the home of Surrey County Cricket Club and the project comprised an increase in general admission seating of 4000 in 2 new upper tier seating decks and hospitality space for 1400 in new lounges, a fantastic roof terrace with fabulous views across London, new retail space, ticket office and security rooms and an extension and refit to the historic pavilion. The Oval is arguably the second biggest, most

Carnegie School of Sports, Leeds

By |23 July 2023|

Project Location: Leeds, West Yorkshire BMS System Fitted: Client: About this Project: CSS is the first building as part of the Leeds Beckett University Campus that LCSL have carried out. Utilising a Tridium Niagara 4 Building Management System, LCSL carried out full control & integration of the gas safety systems, LTHW heating, DHWS, Modbus VAV’s & Modbus Space temperature C02 sensors, Air Handling Units, Chilled Water Systems, VRF systems, Lighting / PIR integration systems and full metering. LBU are proud to call themselves

Fulham FC – Riverside Stand

By |23 July 2023|

Project Location: London BMS System Fitted: Client: About this Project: LCSL have supplied a full building and energy management system complete with the integration of 3rd party LG packaged air handling units, LG VRF, cold water services, electric, water, gas & energy metering, S&S northern gas safety systems, packaged PHE’s, Gas booster systems, Sprinkler System, Irrigation systems, pitch lighting, UPS monitoring, Smoke Damper system, Lighting / Emergency Lighting, Heat interface units, LV Switch gear monitoring, CAV’s, C02 monitoring, LTHW systems, Lifts & Spa

Middlesbrough Sports Village

By |24 November 2021|

Project Location: Middlesborough BMS System Fitted: Client: About this Project: Middlesbrough Sports Village involved the creation of a £10m multi-sports hub building set within a wider sports campus. The project involved the consolidation of several existing leisure sites in Teesside creating a purpose-built facility for a wide range of users. The facilities included an indoor sprint track and events arena, gym, outdoor athletics track, 700-seater grandstand, velodrome and multi-use games pitches. Working for our longstanding client NG Bailey, the project was delivered on

Reading FC Bearwood Park Training Ground

By |18 November 2020|

Project Location: Reading FC Training Complex BMS System Fitted: Client: About this Project: The site at Bearwood Estate was identified and contracts were initially exchanged with the Royal Merchant Navy School Foundation for the purchase of nearly 120 acres of land in October 2013. The planning process was difficult and protracted and progress stalled at times but, in little more than two years at the helm, Mr Dai’s determination and vision has entirely transformed the promise of a modern purpose-built training

AFC Wimbledon Plough Lane Stadium

By |13 October 2020|

Project Location: Wimbledon Plough Lane BMS System Fitted: Client: About this Project: It has been 29 years since Wimbledon last kicked a ball in anger at Plough Lane when they took on Crystal Palace in the top-flight. Since then it has been a long road back. There was the controversial move to Milton Keynes and the rebranding to MK Dons, the formation of the fans-owned AFC Wimbledon 18 years ago and six promotions. But now they have built a new stadium a few hundred yards from

Ashton Gate Stadium, Bristol

By |1 November 2017|

Project Location: Bristol BMS System Fitted: Client: About this Project: After undertaking the successful installation of the south stand Building Energy Management System during the summer of 2015, Linear Control Systems have installed and are currently finalising the commissioning for the third phase of the Building Energy Management System for the west stand at Ashton Gate Stadium, Bristol. Both building management systems are based on the Niagara AX frame work. The BEMS will control the varied range of the plant to provide the

Molineux Stadium, Wolverhampton FC

By |15 November 2014|

Project Location: Wolverhampton BMS System Fitted: Client: About this Project: Molineux Stadium has been the home of Wolverhampton Football Club since 1889. The stadium is renowned for being the first ‘new build’ stadium of its kind in the history of the football league. This magnificent stadium was one of the first to install floodlights and was responsible for hosting some of the first ever European club games back in the 50s. By the time the 90s arrived, Molineux became one of the biggest

The Copthorne Hotel (Sheffield United Football Club)

By |9 November 2014|

Project Location: Sheffield BMS System Fitted: Client: About this Project: The Sheffield United Copthorne Hotel is located directly beside the Sheffield United FC stadium. Containing no less than 158 guest rooms, this stylish and modern hotel also boasts a luxurious penthouse suite. The hotel has a range of facilities, including a fitness room, conference room, on-site parking and banqueting suites.  Not to mention the renowned 18fifty5 Restaurant, awarded a Rosette to celebrate its fine dining and excellent cuisine.

Go to Top