Ashton Gate Stadium, Bristol

Project Location:

Bristol

BMS System Fitted:

Client:

About this Project:

After undertaking the successful installation of the south stand Building Energy Management System during the summer of 2015, Linear Control Systems have installed and are currently finalising the commissioning for the third phase of the Building Energy Management System for the west stand at Ashton Gate Stadium, Bristol.

Both building management systems are based on the Niagara AX frame work. The BEMS will control the varied range of the plant to provide the facilities team total control of the ground and will be used to ensure the heating and ventilation plant operates as efficiently as possible.

The BEMS includes corporate and conferencing facilities, home and away team dressing rooms and the monitoring of all the utility energy usage, also incorporating the concession areas situated in the stands.

More About The Ashton Gate Stadium Project

Linear Control Systems have supplied and installed the Building Energy Management System at Molineux the home of Wolverhampton Wanderers and, more recently, to the Leicester Tigers. To date, our knowledge and experience of working within this specialised sector has paid dividends, and our experience of the unusual operating factors that persist with a sports utility ground are second to none.

Linear Control Systems Maintenance division have secured the contract working closely with the facility’s team offering 24/7 support and full remote access, invaluable, cost effective especially with sports grounds.

Learn more about our BMS Maintenance offering by clicking here.

 

Share this Project!